CANYON HIGH SCHOOL S.T.E.M. FACILITY Education

Project Data

0
square feet
0
days to erect
Number of Collars Bay Spacing
68 Varied, 8’-6” to 14’-9”
Location: Santa Monica, CA
Owner: Orange Unified School District
GC: Gafcon Inc.
Engineer: Saiful. Bouquet Structural Engineers
Architect: HED Design
Steel Fabricator: ConXtech Manufacturing
Steel Erector: ConXtech
ConXtech Scope: Structural Steel, Decking

Project Narrative

Part of the Canyon High School Campus Modernization program, the new 2-story, 67k SQFT Canyon High School STEM building houses 12 science labs, 12 classrooms, student services, and administrative offices. The Gafcon, Inc. team championed the use of ConXtech as one of many value engineering ideas for this program. ConXtech’s prefabricated structural solution resulted in significant cost savings related to material and reduced onsite inspections and reduced the overall construction schedule by approximately six weeks.

This project has a ConXL 400 chassis:

Lower & Locking™ Connection

Height & Assembly Speed

  • 2 to 10 Stories

  • 10 to 15,000 ft2 per day

Design Parameters

Column Size 400 mm (16″ HSS or Box)
Beam Depth 18″ to 30″ for SMF, deeper for OMF
Beam Spans 18′ to 45’+