Kaiser Permanente, Santa Rosa Medical Office

Project Details

0
square feet
0
days to erect
Location: Santa Rosa, CA
Owner:
Kaiser Permanente
GC:
Turner Construction
Engineer: Thornton Tomasetti / ConXtech
Architect:
Hawley Peterson Snyder Architects

Project Narrative

This three-story, 88,000 ft² medical office building will offer a wide range of primary and specialty care services, including pharmacy, lab and imaging. It will be the first all-electric facility in the Kaiser Permanente system, including heating and hot water. The building is set to achieve at least LEED Gold certification, incorporating innovative photochromic windows, in which the glass changes opacity with outdoor light intensity, as well as solar panels. It will also be a zero-net energy building, meaning it will generate about as much energy as it uses each year.

The standardized edge of steel dimension eliminated high cost bent plates. The ConX System also contributed to a simplified design & detailing of stud framing attachments, streamlining the installation of stud framing. Efficient building design and grid layout reduced the superstructure weight resulting in a more effective moment frame.

This project has a ConXL 400 chassis:

Lower & Locking™ Connection

ConXL 400

Height & Assembly Speed

  • 2 to 10 Stories

  • 10 to 15,000 ft2 per day

Design Parameters

Column Size 400 mm (16″ HSS or Box)
Beam Depth 18″ to 30″ for SMF, deeper for OMF
Beam Spans 18′ to 45’+