Project Narrative
This six-story, 210,000 ft² hotel features 288 guest rooms, a second floor pool deck, ground floor retail space, and two levels of subterranean parking. The structural steel portion of the construction was assemled in only eight days, with more than 120 pieces of steel being erected per day. It’s also located directly across from Monterey Park’s bustling Atlantic Times Square, a 200,000+ft2 mixed-use development featuring hotels and commercial/retail space.
This project has a ConXR™ 200 chassis:
Lower & Locking™ Connection
ConXR 200
Height & Assembly Speed
Design Parameters
Column Size | 200 mm (8″ HSS) |
Beam Depth | 12″ (variable weight) |
Beam Spans | 8′ to 20′ |