Center for Liberal Arts at the College of Alameda

2025-01-24T15:09:03-08:00

Center for Liberal Arts at the College of Alameda Education Project Data square feet days to erect Location: Alameda, CA Owner: Peralta Community College District GC: Overaa Construction Engineer: Forell / Elsesser Engineers Architect: Noll and Tam Architects Steel Fabricator: ConXtech Manufacturing Steel Erector: ConXtech ConXtech Scope: Structural Steel, Decking [...]

California Lutheran University Swenson Science Center

2025-01-24T14:51:34-08:00

California Lutheran University Swenson Science Center Education Project Data square feet days to erect Location: Thousand Oaks, CA Owner: California Lutheran University GC: W.E. O’Neil Engineer: Risha Engineering Architect: Rasmussen and Associates Steel Fabricator: ConXtech Manufacturing Steel Erector: ConXtech ConXtech Scope: Structural Steel, Decking Download Project Bio Project [...]

Cielo

2025-01-29T20:08:55-08:00

Cielo Project Details square feet days to erect Location: San Diego, CA Owner: Bayview SD, LLC Architect: DFH Architects, LLP Engineer: Englekirk GC: R.D. Olson Project Narrative Cielo, a $33M Development in San Diego, CA, has 76,000 square feet of rentable space with 70 apartments in a [...]

Kaiser Permanente, Hesperia

2025-01-16T14:14:05-08:00

Kaiser Permanente, Hesperia Project Details square feet days to erect Location: Hesperia, CA Owner: Kaiser Permanente GC: McCarthy Engineer: KPFF Architect: Cannon Design Project Narrative 55,000-square-foot Hesperia (CA) MOB, first opened doors in December 2020. The three-story, state-of-the-art facility is home to 30 provider offices along with [...]

Kaiser Permanente, Springfield

2025-01-16T13:29:24-08:00

Kaiser Permanente, Springfield Project Details square feet days to erect Location: Springfield, VA Owner: Kaiser Permenante GC: Hensel Phelps Engineer: KPFF Architect: Cannon Design Project Narrative The newly constructed 98,250 SF medical office building in Springfield, VA accommodates Kaiser Permanente personnel from the existing office, while the [...]

The Depot

2025-01-10T15:00:23-08:00

The Depot Project Details square feet days to erect Location: Los Angeles, CA Owner: The Luzzatto Company GC: KPRS Engineer: KPFF Architect: HLW International Project Narrative What was formerly known as the dairy truck servicing depot for Unified Grocers has now been reimagined as The Depot—a new [...]

Icon at Silverleaf

2025-01-30T23:39:07-08:00

Icon at Silverleaf Project Data square feet days to erect Location: Scottsdale, AZ Owner: The New Home Company / DMB GC: PWI Construction, Inc. Engineer: Wright Engineers Architect: Robert Hidey Architects Steel Contractor: ConXtech Manufacturing Steel Erector: ConXtech Construction ConXtech Scope: Structural Steel, Decking Project Narrative Located [...]

Torrance Hunt Cancer Center

2025-01-07T14:24:50-08:00

Torrance Hunt Cancer Center Project Details square feet days to erect Location: Owner: Torrance Memorial Medical Center GC: McCarthy Construction Engineer: KPFF Architect: c-a Architects Project Narrative This state-of-the-art medical facility consolidates Torrance Memorial’s existing cancer treatment services into one location, and provides specialists to [...]

Kaiser Permanente, Clairemont Mesa

2025-01-07T12:27:35-08:00

Kaiser Permanente, Clairemont Mesa Project Details square feet days to erect Location: Owner: Kaiser Permanente GC: DPR Construction Engineer: KPFF Architect: Hanna Gabriel Wells Project Narrative The Kaiser Permanente Clairemont Mesa Medical Offices is a new four-story, 90,000-sq.-ft. center that replaces the aging facility demolished [...]

500 Broadway

2025-01-08T09:18:03-08:00

500 Broadway Project Data square feet days to erect Location: Owner: Witkoff GC: Pankow Builders Engineer: Nabih Youssef Associates Architect: KoningEizenberg Steel Contractor: ConXtech Manufacturing Steel Erector: ConXtech Construction ConXtech Scope: Structural Steel, Decking Project Narrative 249 Units, 265,000 SF Residential, 34,187 SF Retail/Restaurant, 1.0 [...]

Hampton Inn Oakland

2025-01-30T23:32:37-08:00

Hampton Inn Oakland Project Details Project Narrative This six-story hotel features six floors of ConXR steel frame over two levels of concrete. Site access was extremely limited with existing buildings on three sides only a few feet away. This hotel is near the Oakland Convention Center, Oakland City [...]

Kaiser Permanente, Redwood City

2025-01-29T20:07:50-08:00

Kaiser Permanente, Redwood City Project Details square feet days to erect Location: Owner: Kaiser Permanente GC: Swinerton Builders Engineer: John A. Martin & Associates Architect: HoK Project Narrative This medical office building provides specialty medical services delivered in Kaiser’s new collaborative care concept, “Reimagining Ambulatory [...]

Kaiser Permanente, Everett

2024-11-13T13:34:29-08:00

Kaiser Permanente, Everett Project Details square feet days to erect Location: Owner: Kaiser Permanente GC: Mortenson Engineer: KPFF Architect: HoK Project Narrative A four-story, 165,000-square-foot outpatient surgery center recently added to the existing 73,000-square-foot building. The expanded facility includes primary and specialty care, surgical services, [...]

Kaiser Permanente, Caton Hill

2024-11-13T13:43:55-08:00

Kaiser Permanente, Caton Hill Project Details square feet days to erect Location: Owner: Kaiser Permanente GC: Whiting-Turner Construction Engineer: KPFF Architect: HKS Project Narrative This 5 story, 258,000 ft² Kaiser Permanente medical office building features otpatient surgery, diagnostic services, imaging services, 4 operating/procedure rooms, interventional [...]

Kaiser Permanente, Lutherville-Timonium

2024-11-13T13:45:32-08:00

Kaiser Permanente, Lutherville-Timonium Project Details square feet days to erect Location: Owner: Kaiser Permanente GC: Whiting-Turner Construction Engineer: KPFF Architect: Gresham Smith Project Narrative In addition to primary care, 24/7 urgent care, and a full range of radiology services and pharmacy operations, the 225,000-square-foot space [...]

Santa Monica High School Discovery Building Education

2024-11-12T12:50:05-08:00

SANTA MONICA HIGH SCHOOL DISCOVERY BUILDING Education Project Data square feet days to erect Number of Collars Bay Spacing Structure Weight 153 38’-0” 1360 tons Location: Santa Monica, CA Owner: Santa Monica -Malibu Unified School District GC: McCarthy Construction Engineer: Saiful. Bouquet Structural Engineers Architect: HED Design Steel Fabricator: ConXtech/Zamil [...]

CANYON HIGH SCHOOL S.T.E.M. FACILITY EDUCATION

2025-01-10T10:47:08-08:00

CANYON HIGH SCHOOL S.T.E.M. FACILITY Education Project Data square feet days to erect Number of Collars Bay Spacing 68 Varied, 8’-6” to 14’-9” Location: Santa Monica, CA Owner: Orange Unified School District GC: Gafcon Inc. Engineer: Saiful. Bouquet Structural Engineers Architect: HED Design Steel Fabricator: ConXtech Manufacturing Steel Erector: ConXtech [...]

North Commons Student Housing

2024-11-12T12:54:13-08:00

North Commons Student Housing Project Data square feet days to erect Number of Collars Bay Spacing Structure Weight 386 Varied, 8’-6” to 14’-9” 483 tons; 14.5 lbs./ft² Location: San Marcos, CA Owner: CSUSM/Sea Breeze Properties Partnership GC: Turner Engineer: KPFF Architect: Safdie Rabines Steel Contractor: ConXtech Manufacturing Steel Erector: [...]

Confidential Life Sciences R&D: Pilot Plant Development

2024-11-13T15:27:49-08:00

Life Sciences R&D | Pilot Plant Project Details square feet days to erect Location: Owner: Confidential GC: DPR Construction, Inc. Engineer: Jacobs Life Sciences Architect: Jacobs Life Sciences ConXtech Scope: Supply and Installation of Structural Steel, Edge Closure, Elevator Steel, Prefab Stairs, and Metal Decking Project Narrative [...]

Thomas Berkley Square

2024-11-12T12:55:05-08:00

Thomas Berkley Square Project Details square feet days to erect Location: Oakland, CA Owner: The Bedford Group GC: UPA Engineer: FBA Architect: Holt Hinshaw, San Francisco, CA Project Narrative Originally designed to be framed using bearing-wall light-gauge steel studs, The Bedford Group wanted to utilize the simplicity and speed [...]

550 Moreland

2024-11-12T12:55:45-08:00

550 Moreland Project Details square feet days to erect Location: Santa Clara, CA Owner: Prometheus GC: Palisade Builders Inc. Engineer: FBA Engineers Architect: Jon Worden Architects Project Narrative Located in Santa Clara, CA, this luxury apartment complex features two 8-story buildings and a rental & recreation building [...]

Moffett Field

2024-11-12T15:24:09-08:00

Moffett Field Project Details square feet days to erect Location: Moffett Field, CA Owner: US Army Corps of Engineers GC: Walbridge/Overaa, a Joint Venture Engineer: GPLA – Gregory P. Luth and Associates Architect: Barge Wagonner Sumner & Cannon Project Narrative Armed Forces Reserve Center (AFRC) located at Moffett [...]

Vidrio

2024-11-12T15:24:42-08:00

Vidrio Project Details square feet days to erect Location: Pittsburg, CA Owner: AF Evans Architect: Dahlin Group Project Narrative This 5-story, 120,100 ft2 mixed use development in Pittsburg, CA features 196 units on top of nearly 40,000 ft2 of retail space below. Also included are two public plazas. This [...]

Broadway Grand

2024-11-12T15:25:25-08:00

Broadway Grand Project Details square feet days to erect Location: Oakland, CA Owner: Signature Development Group GC: Signature Development Group Engineer: Nishkian Menninger Architect: MBH Architects Project Narrative Located on the corner of Broadway and Grand in downtown Oakland CA, the 186,000 ft2 4 and 5 story ConX [...]

Selma Tommie Hotel

2024-11-12T15:25:40-08:00

SELMA TOMMIE HOTEL Project Details square feet days to erect Location: Hollywood, CA Owner: Relevant Group GC: Suffolk Construction Company Engineer: Englekirk Structural Engineering Architect: STINBERG Project Narrative Selma Tommie Hotel is an 9 story a commercial building consists of 212 Hotel guest room with ground floor [...]

Mezzanine

2022-03-02T22:55:26-08:00

ConX for Mezzanine Structures Example: A 25’ x 25’ mezzanine module used part-time in a Hayward factory and part-time at events like Autodesk University. This particular structure is comprised of the ConXR 200 system and can be assembled or disassembled in just a few hours with 3 or 4 personnel. [...]

88 Hillside

2024-11-12T15:27:41-08:00

88 Hillside Project Details square feet days to erect Location: Daly City, CA Owner: Landmark Daly City, LLC Architect: DIAP Project Narrative This 117,000 ft2, mixed-use infill project is located in Daly City, CA. The development also features ground level retail and an underground parking structure. The [...]

Navy Lodge

2024-11-12T15:29:38-08:00

Navy Lodge Project Details square feet days to erect Location: North Island, Coronado, CA Owner: US Navy (NAVFAC) GC: RQ Construction, LLC Engineer: GPLA – Gregory P. Luth and Associates Architect: RQ Construction, LLC Project Narrative This 146,500 ft2, 205 room Navy Lodge project was originally designed [...]

AC Marriott Hotel

2024-11-12T15:30:14-08:00

AC Marriott Hotel Project Details square feet days to erect Location: San Jose, CA Owner: PCA III, LLC Engineer: DLR Group Architect:  DLR Group Project Narrative The AC Marriott Hotel is a seven-story, 210 room hotel comprising 79,500 square feet. Located in downtown San Jose, it is [...]

Santana Row

2024-11-12T15:30:29-08:00

Santana Row Project Details square feet days to erect Location: San Jose, CA Owner: Federal Realty Investment Trust Architect: MBH Architects Project Narrative In 2002 the nearly complete residential core of the Santana Row development in San Jose, CA, was devastated by a 13 alarm fire. Efforts [...]

Aera Pipe Rack

2024-11-12T20:43:41-08:00

Aera Pipe Rack Project Details Location: Bakersfield, CA Owner: Aera Energy LLC GC: Aera Energy LLC Engineer: Joshua Moody, S.E. Architect: Technical Services & Management Days to Erect: 20 Project Narrative Water Processing Plant on Central California Oil Field ConXtech has an ideal solution for Pipe Rack and Processing structures. [...]

Contra Costa County Administration Building

2025-01-10T10:40:06-08:00

Contra Costa County Administration Building Project Details square feet days to erect Location: Martinez, CA Owner: Contra Costa County GC: Hensel Phelps Engineer: Thornton Tomasetti Architect: Fentress Architects / KMD Architects Project Narrative Replacing the current Contra Costa County Administration building, this new four-story structure is designed [...]

Godfrey Hollywood

2024-11-12T15:32:34-08:00

Godfrey Hollywood Project Details square feet days to erect Location: Hollywood, CA Owner: Five Chairs Development GC: Davis Reed Construction, Inc. Engineer: Englekirk Structural Engineering Architect: Steinberg Hart Architects Project Narrative This contemporary boutique hotel features 200 guest rooms, a restaurant space and a rooftop pool deck. [...]

800 High Street

2024-11-12T15:32:52-08:00

800 High Street Project Details square feet days to erect Location: Palo Alto, CA Owner: High Street Partners, LLC GC: Palisade Builders, Inc Architect: Jon Worden Architects Project Narrative This four-story luxury condominium complex is situated in the heart of downtown Palo Alto, CA, just a short [...]

8 Orchids

2024-11-12T15:33:06-08:00

8 Orchids Project Details square feet days to erect Location: Oakland, CA Owner: Bayrock Residential GC: JR Roberts Engineer: FBA Engineers Architect: HDO Architects Project Narrative This nine-story ConXR structure atop a 3-story concrete podium offers over 200,000 ft2 of residential space. Common areas include a 20-foot high [...]

235 Berry Street

2024-11-12T15:33:29-08:00

235 Berry Street Project Details square feet days to erect Location: San Francisco, CA Owner: Signature Development Group GC: Devcon Architect: Leddy Maytum Stacy Architects Project Narrative Located just blocks from AT&T Stadium in the Mission Bay District of San Francisco, CA, this 127,000 ft2high-end condominium building [...]

Esprit Park

2024-11-12T15:33:45-08:00

Esprit Park Project Details square feet days to erect Location: San Francisco, CA Owner: Build Inc. GC: Ross Construction Architect: Jon Worden Architects Project Narrative Esprit Park is a 162,122 ft2 luxury condominium project located in the heart of the historic Dog Patch district of San Francisco, CA. [...]

The Crossing

2024-11-12T20:44:05-08:00

The Crossing Project Details square feet days to erect Location: San Bruno, CA Owner: SNK Development GC: SNK Construction Architect: HDO Architects Project Narrative The Crossing’s two 5-story ConX structures provide 525,000 ft2 of luxury apartments and condominiums over a 2-level subterranean parking podium. Without the 4-story limitation [...]

The Arpeggio

2024-11-12T15:34:24-08:00

The Arpeggio Project Details square feet days to erect Location: Berkeley, CA Owner: SNK Development GC: SNK Construction Engineer: FBA Engineers Architect: WRNS Studio Project Narrative This 9-story, 143-unit condominium complex in downtown Berkeley, CA features 15,000 ft2 of retail on the first floor, and a 160-car subterranean [...]

Eighth & Grand

2024-11-12T15:34:36-08:00

Eighth & Grand Project Details square feet days to erect Location: Downtown Los Angeles, CA Owner: Carmel Partners GC: CP Construction Engineer: Englekirk Structural Engineering Project Narrative “Eighth & Grand,” located prominently in downtown Los Angeles, is a 7-story mixed use building with four levels of underground parking that [...]

Meridian Residences

2024-11-12T15:36:29-08:00

Meridian Residences Project Details square feet days to erect Location: Newport Beach, CA Owner: The New Home Company GC: Bernards Builders Engineer: Englekirk Architect: MVE Studio Project Narrative This five-building, 262,000 square foot luxury condominium and townhome development features 79 units ranging from 2,335 to 3,905 ft2. Its resort-like [...]

Hilton at The Source

2024-11-12T15:36:55-08:00

Hilton at The Source Project Details square feet days to erect Location: Buena Park, CA Owner: M&D Properties GC: Swinerton Builders Engineer: Englekirk Structural Engineering Architect: Gene Fong Associates Project Narrative This 94,000 ft2, 172-room Hilton hotel is part of The Source, a 400,000 ft2 urban destination center [...]

Stanford Law School

2025-01-13T10:09:58-08:00

Stanford Law School Project Details square feet days to erect Location: Stanford, CA Owner: Stanford University GC: Dome Construction Engineer: Degenkolb Engineers Architect: Ennead Architects Project Narrative In the footprint once occupied by Kresge Auditorium, the new William H. Neukom academic building provides 65,000 sf of clinic, seminar, [...]

Southwestern College HEC

2025-01-13T14:17:09-08:00

Southwestern College HEC Project Details square feet days to erect Location: National City, CA Owner: Southwestern College GC: Sundt Construction Engineer: TTG Architect: Johnson Favaro Project Narrative This 2-story, 22,400 ft2 educational building on Southwestern College’s National City, CA campus features classrooms, a lecture hall, four laboratories and [...]

Lawson Lane

2025-01-10T11:32:43-08:00

Lawson Lane Project Details square feet days to erect Location: Santa Clara, CA Owner: Sobrato Development Company GC: Sobrato Construction Architect: Form4 Architects Project Narrative The Lawson Lane Campus, located at Central Expressway and San Tomas in Santa Clara, CA, is the development of three new office [...]

Nickelodeon Studios

2025-01-10T11:26:58-08:00

Nickelodeon Studios Project Details square feet days to erect Location: Burbank, CA Owner: Accord/BRO Members, LLC GC: McCormick Construction Engineer: Englekirk Architect: DLR Group Project Narrative This 110,000 ft2 expansion to Nickelodeon Studios’ existing 72,000 ft2 complex will serve as the West Coast “hub” for their animation and live-action production [...]

Casino M8trix

2025-01-10T15:10:42-08:00

Casino M8trix Project Details square feet days to erect Location: San Jose, CA Owner: M8trix GC: South Bay Construction Engineer: SEI Architect: ARC TEC, Inc. Project Narrative This 8-story, 36,000 ft² casino cardroom in San Jose, CA offers table games, card games and several restaurants & bars. [...]

SFO Airport Canopy

2024-11-12T19:56:56-08:00

SFO Airport Canopy Project Details square feet hours to erect Location: San Francisco, CA Owner: SFO Airport, City & County of San Francisco GC: Turner Construction Engineer: ConXtech Architect: Corgan / LDA Architects, Inc. Project Narrative This ConXL 400 canopy frame was assembled in 6 hours. Providing cover for a [...]

Building Y

2024-11-12T19:57:45-08:00

Building Y - Commercial Office Building Project Details square feet days to erect Location: Bakersfield, CA Owner: S.C. Anderson GC: S.C. Anderson Engineer: Engel & Company Architect: Milazzo & Associates Project Narrative This 3-story ConXL commercial office building is located in Bakersfield, CA. [...]

San Jose State University, Student Wellness Center

2025-01-30T23:27:30-08:00

San Jose State University, Student Wellness Center Project Details Project Narrative This three-story, 53,000 ft2 facility on the San Jose State University campus provides complete health and wellness services and supports the university’s overall student health services program. It includes exam and treatment rooms, offices and training workrooms, dental [...]

Stanford Neuroscience Health Center

2024-11-13T14:03:28-08:00

Stanford Neuroscience Health Center Project Details square feet days to erect Location: Owner: Stanford Health Care GC: Cahill Contractors Engineer: Degenkolb Engineers Architect: TEF Design Project Narrative Located on the Stanford University campus, this 92,000 ft2 medical office building is comprised of four levels of above [...]

Downtown West MOB

2024-11-13T14:40:43-08:00

Downtown West MOB Project Details square feet days to erect Location: Owner: Robhana Group GC: Oltmans Construction Co. Engineer: KPFF Architect: Ware Malcomb Project Narrative ConXtech assembled this four-story, 57,700 ft² structure adjacent to the I-10 corridor in Los Angeles, one of the busiest roadways [...]

Kaiser Permanente, Irwindale

2025-01-07T14:45:57-08:00

This 196,500 ft², five-story medical office building sits on Kaiser Permanente’s existing 14-acre campus in Roseville, CA. This Kaiser facility will house multiple departments including opthalmology, women’s health, an MRI/imaging suite, optical sales, a pharmacy, and physical therapy. The ConX System easily accommodated the architectural features of the structure, including a large sweeping curved facade. The site where the medical office building is being constructed is also adjacent to both an existing Kaiser facility that remained open during construction and a parking garage that is under construction. The ConX System was an excellent, non-obtrusive solution to these particular site constraints.

CBU Engineering Facility

2024-11-12T20:12:43-08:00

CBU Engineering Facility Project Details square feet days to erect Location: Riverside, CA Owner: California Baptist University GC: Tilden Coil Constructors Engineer: Walter P. Moore Architect: Gensler Project Narrative This new Engineering facility at California Baptist University will provide classroom, faculty and administrative space. Large, hangar-style doors [...]

1450 Franklin

2024-11-12T20:15:26-08:00

1450 Franklin Project Details square feet days to erect Location: San Francisco, CA Owner: Village Properties Engineer: FBA Engineers Architect: BDE Project Narrative This 10-story ConXR steel structure sits atop four levels of concrete podium including garage space and retail. Comprised of 67 units, this luxury condominium [...]

Pacific City

2025-01-10T14:37:25-08:00

Pacific City Project Details square feet days to erect Location: Huntington Beach, CA Owner: DJM Capital GC: C.W. Driver Builders Engineer: FWC Structural Engineers  Architect: SMS Architects Project Narrative This 3-story ConXL structure sits atop a 2-story parking garage. Street level retail areas complete this innovative building [...]