Centinela ER Addition (OSHPD)

Project Details

0
square feet
0
days to erect
Location: Inglewood, CA
Owner: Prime Healthcare
Centinela, LLC
GC: CNC Contractors
Engineer: Degenkolb
Architect: Puchlik Design Associates

Project Narrative

This structure is an OSHPD designed, 2,820 ft2 emergency room addition to the main hospital structure.

ConX Solutions

This hospital and ER are among the busiest in the region, so it was imperative that construction not disrupt current operations. ConX frame assembly was much faster than conventional methods, with a smaller construction footprint. Throughout construction hospital staff had uninterrupted access to the rest of the hospital and existing emergency room.

This project has a ConXL 400 chassis:

Lower & Locking™ Connection

ConXL 400

Height & Assembly Speed

  • 2 to 10 Stories

  • 10 to 15,000 ft2 per day

Design Parameters

Column Size 400 mm (16″ HSS or Box)
Beam Depth 18″ to 30″ for SMF, deeper for OMF
Beam Spans 18′ to 45’+