Kaiser Permanente, Redwood City

Project Details

0
square feet
0
days to erect
Location: Redwood City, CA
Owner: Kaiser Permanente
GC: Swinerton Builders
Engineer: John A. Martin & Associates
Architect: HoK

Project Narrative

This medical office building provides specialty medical services delivered in Kaiser’s new collaborative care concept, “Reimagining Ambulatory Care Design (RAD)”. The facility also includes wellness education and retail services.

ConX Solutions

2x-5x faster than conventional steel. 10,000 -15,000 sqft. assembled/day. Expedited occupancy for client. Faster design through delivery than any other structural alternative. Rapid turn over to other follow-along trades. Standard processes expedite cycle time. Pre-fabricated components accelerate delivery schedule. Pre-approved connections accelerated plan checks and regulatory approvals.

This project has a ConXL 400 chassis:

Lower & Locking™ Connection

ConXL 400

Height & Assembly Speed

  • 2 to 10 Stories

  • 10 to 15,000 ft2 per day

Design Parameters

Column Size 400 mm (16″ HSS or Box)
Beam Depth 18″ to 30″ for SMF, deeper for OMF
Beam Spans 18′ to 45’+