Nickelodeon Studios

Project Details

0
square feet
0
days to erect
Location: Burbank, CA
Owner: Accord/BRO Members, LLC
GC: McCormick Construction
Engineer: Englekirk
Architect: DLR Group

Project Narrative

This 110,000 ft2 expansion to Nickelodeon Studios’ existing 72,000 ft2 complex will serve as the West Coast “hub” for their animation and live-action production teams. The expansion allows the company to bring all of its creative personnel back under one roof.

ConX Solutions

The open bays inherently provided by the ConXL System allowed for flexible placement of highly advanced animation imagery equipment, as well as office space customization. Additionally, the ConXL chassis allowed for seamless integration of the precast concrete exterior wall system.

Photo Gallery

This project has a ConXL 400 chassis:

Lower & Locking™ Connection

ConXL 400

Height & Assembly Speed

  • 2 to 10 Stories

  • 10 to 15,000 ft2 per day

Design Parameters

Column Size 400 mm (16″ HSS or Box)
Beam Depth 18″ to 30″ for SMF, deeper for OMF
Beam Spans 18′ to 45’+